CPP is committed to all aspects and areas involving LNG project construction. The company has independent intellectual property rights of mixed refrigerant liquefaction process package, with internationally advanced energy efficiency, and mastered the natural gas deep acid removal process and LNG cryogenic storage tanks construction. In the aspect of LNG receiving station, CPP has fully mastered the key technologies such as loading and unloading, storage, BOG recondensation, gasification, pre-cooling design and risk analysis, and dozens of core technologies such as LNG storage tanks seismic analysis, stress analysis of, temperature simulation analysis, adjacent tank combustion analysis, and capable of designing 160,000 cubic meters and 200,000 cubic meters storage tanks. These achievements have been verified by internationally renowned consulting firms and have reached the international advanced level among similar projects.